Article catalogue:
- 1 、Which type of bundling and baling machine is used in concrete aerated block brick factory? what brand can you recommend?
- 2 、Is the packing hot in the brick factory?
- 3 、How to pack cement bricks
- 4 、Why is the automatic packing machine for floor tiles good?
- 5 、Is the salary high when the floor tile factory runs an automatic packing machine?
- 6 、What is the working principle of pneumatic baling machine?
Which type of bundling and baling machine is used in concrete aerated block brick factory? what brand can you recommend?
Brick factory packing, must meet three conditions, (strong tension, strong sealing of the machine, machine durable)
1. The bricks are restacked and scattered, and a large tension machine is needed to bind the bricks tightly.
2. The dust in the brick factory is serious, and the machine must be well sealed, otherwise it is easy to enter the machine and cause failure.
3. The machine must be durable, because the high frequency of packing bricks, large quantity, and poor machines can not be used.
Suggestion: pneumatic / PX-19 brick factory special, electric / ZD- 16 one-button baler
Is the packing hot in the brick factory?
The packing of the brick factory must be hot, because they all work in the sun.
The fastest way to pack bricks in brick factories is to pack bricks through a portable packing machine. At present, the most widely used way is pallets-free packaging, which is more efficient.
With the improvement of social efficiency, most brick factories begin to use pallet-free packaging bricks, which can not only save costs but also improve efficiency. The bricks packed with free pallets are very convenient to be shipped by forklift and do not need to be transported up and down manually as before. Safety and environmental protection can also be achieved in transportation.
How to pack cement bricks
In cities close to Guangdong, such as Fujian, Guangxi, Jiangxi, Hunan and other places, brick factories may transport bricks to all parts of Guangdong for sale. The current packing methods are as follows:
1. Use wooden pallets to stack bricks on top, use PET plastic steel packing belt, KG-16 portable baling machine, supporting packaging, automatic tightening, locking and cutting, which is convenient for transportation. When loading, you can fork the tray onto the truck directly.
Why is the automatic packing machine for floor tiles good?
Very easy to do, floor tile automatic packing machine can save a lot of manual work, can also save a lot of effort, floor tile weight is very heavy, if you rely on workers to move, it is very laborious, if there is an automatic packing machine, then floor tiles placed directly on the machine can be packed directly, that will be much easier, I hope my answer can help you
Is the salary high when the floor tile factory runs an automatic packing machine?
Depending on your salary requirements, the salary of the automatic packing machine from the floor tile factory is about 6 to 8 thousand. The working hours are very long, sometimes 12 hours.
What is the working principle of pneumatic baling machine?
The function of the pneumatic packing machine is to tighten the packing belt, weld the joint of the packing belt, and remove the excess strap. the principle is (the pneumatic motor drives the turbine to tighten, and the welding motor drives the vibrator to produce temperature).
This is the end of the video introduction of the brick factory baler. Thank you for taking the time to read the contents of this site. Don’t forget to look for more information about the video of the brick machine baler and the brick factory baler.